Flood Control Projects

Flood Control Master Plan
July 21, 2016
Sontag Ditch Improvements Project

The project consists of the installation of approximately 255 linear feet of Class V Reinforced Concrete Pipe (RCP) to facilitate the movement of storm runoff water between the Sontag Ditch and Stone Corral Ditch canals. The improvements on the District’s property includes the installation of 24 inch RCP on both the north and south side of Avenue 384 with reinforced concrete turnout structures including canal gates.